Tag Archives: Industrial

Industrializing the West

csIMG_3676

My plan was to walk for 2-3 hours and complete as much of the west side as possible. Yesterday I walked a mile in this Old Oakland Neighborhood. This was my fourth walk in this area. I had really hoped to have all the “north of 496” streets done by now, but that hasn’t been the case. This is my last section though and today was going to get most of it done-except I didn’t. I think today was the first time I really felt I might not get this project done by October 1. When I added up yesterday’s miles to the total I found I was just over 350. If there are a total of 410 miles of streets in Lansing then I should have 60 left. The only problem is that when I walk, I am often re-walking streets I’ve already walked before to get to the places I haven’t walked yet. How many miles of re-walks do I have? I don’t know. Therein lies the problem. I might have only 60 more miles, but I might have more like 80! Even 80, though, are doable. If I walk 6 miles in 2 hours, then I would need to walk 13 times, roughly. We still have 30 days until the gallery opening. That’s less than half. If I walk 6 miles every 2 days I can walk 80 miles! Today’s walk was supposed to be a 6 mile walk. Unfortunately my body didn’t cooperate. I was only able to walk about 2.6 miles before a hunt for a restroom began. I had hoped the West Side Park would be unlocked but it was not.  I would love to say that this hasn’t happened to me before while walking, but I can’t. In fact finding a rest room in Lansing is almost impossible. The Lansing City Market is really the only public restroom on the entire river trail. I’m really hoping that providing awareness for lack of city restrooms doesn’t become the legacy of this project. I suppose I could be known for worse things! 

Decorative Flowers at Padnos

csIMG_3706

Unused rail stop on Sunset

csIMG_3699

Blocked off open field owned by BWL

csIMG_3690

My Walk today